-
IndoSpace Industrial & Logistics Park
Chakan I Phase II, Maharashtra, Pune
-
Total Land Parcel
38 Acres
-
Total Chargeable Area
9,63,380 sq. ft
-
Type of Land
RED (Hazardous)
-
Usage
Industrial / Logistics Park
-
IndoSpace Industrial & Logistics Park
Chakan I Phase II, Maharashtra, Pune
-
Total Land Parcel
38 Acres
-
Total Chargeable Area
9,63,380 sq. ft
-
Type of Land
RED (Hazardous)
-
Usage
Industrial / Logistics Park
The Chakan industrial area phase 2 in Pune has developed into a strong automobile hub over the last decade. Various auto giants like Mercedes Benz, Mahindra and Mahindra and Volkswagen have set up their manufacturing plants in this industrial area, besides companies to make automobile components like ARaymod, Ina bearing. With a number of proposed investments of global phone manufacturers in and around Chakan, Pune has been gaining the attention of electronics manufacturers too. Just 35 km away from Pune, Chakan Phase 2 is also a well-established industrial area under the Maharashtra Industrial Development Corridor (MIDC). It has also seen a massive footfall of global companies over the past decade.
Our Grade-A warehousing and logistics Park, IndoSpace Industrial & Logistics Park Chakan I Phase 2, is a testament to our extensive footprint in this region. Spread over 38 acres, this industrial park in Chakan is just 20 km from the Mumbai-Pune Expressway. It is surrounded by MIDC developments and enjoys great proximity to neighbouring industrial areas like Ranjangaon, Talegaon. It also offers easy connectivity with Pune-Nashik Highway NH 60 at a distance of 10 km and Pune-Ahmednagar-Aurangabad Highway. With Pune International Airport at a distance of 35 km, Pune Railway Station just 40 km away and JNPT at a distance of 120 km, it is easily accessible via multi-modal transport.
Unique Features Of Indospace, Chakan I Phase II, Industrial & Logistics Park
ACCESSIBILITY
- Transport
- Location Advantage
- Airport
- Seaport 1
- Seaport 2
- Railway Station
- National Highways
- State Highways
- City center
- Company Nearby 1
- Company Nearby 2
- Company Nearby 3
- Company Nearby 4
- Company Nearby 5
- Company Nearby 6
- Hospital 1
- Hospital 2
- Hotel 1
- Hotel 2
- Industrial Area
SUPERIOR BUILDING STRUCTURE
Roof
Docking Type
Office
Parking
Structure
Truck Apron
Ventilation
Dock Doors
Fire Detection
Floor
Wall
Skylight
Clear Height
Fire Fighting
Lighting
Roof
Lower Level: RCC slab
Upper Level: ‘Standing seam’, premium roof system that provides 10 years leak-proof warranty and capable of taking solar panel load.
Docking Type
Internal
Office
Over 2 floors: Ground & Mezzanine
Parking
For two and four-wheelers at the office entrance
Structure
Lower Level: The lower level has RCC framed structure with large spans and mezzanine level office provision.
Upper Level: Pre-engineered building, optimised column spacing, and mezzanine level for office
Truck Apron
Concrete, 16.5 m (from the the face of dock wall to edge of pavement)
Ventilation
Lower Level: The lower level has passive ventilation through windows & louvred panels on the external wall, with provision to increase air changes through mechanical ventilation.
Upper Level: Passive ventilation to provide 3-6 air changes through louvred panels on external walls and roof monitor
Dock Doors
Manually operated rolling shutters and mechanically operated dock levellers
Fire Detection
Global NFPA/FM/NBC standard firefighting & suppression systems
Floor
5T/M2. Flat / Super flat floors, FM2-compliant design to support high cube racking
Wall
Lower Level: The upper level has metal panels up to the roof.
Upper Level: Metal panels up to roof
Skylight
Lower Level: NA
Upper Level: Energy-efficient lighting and skylights
Clear Height
Lower Level: 9.2 m
Upper Level: 9.2 m at eaves
Fire Fighting
Ceiling sprinklers, K II 5 external and internal hydrants
Lighting
LED fixtures to provide 150 lx illumination
Roof
Lower Level: RCC slab
Upper Level: ‘Standing seam’, premium roof system that provides 10 years leak-proof warranty and capable of taking solar panel load.
Docking Type
Internal
Office
Over 2 floors: Ground & Mezzanine
Parking
For two and four-wheelers at the office entrance
Structure
Lower Level: The lower level has RCC framed structure with large spans and mezzanine level office provision.
Upper Level: Pre-engineered building, optimised column spacing, and mezzanine level for office
Truck Apron
Concrete, 16.5 m (from the the face of dock wall to edge of pavement)
Ventilation
Lower Level: The lower level has passive ventilation through windows & louvred panels on the external wall, with provision to increase air changes through mechanical ventilation.
Upper Level: Passive ventilation to provide 3-6 air changes through louvred panels on external walls and roof monitor
Dock Doors
Manually operated rolling shutters and mechanically operated dock levellers
Fire Detection
Global NFPA/FM/NBC standard firefighting & suppression systems
Floor
5T/M2. Flat / Super flat floors, FM2-compliant design to support high cube racking
Wall
Lower Level:The upper level has metal panels up to the roof.
Upper Level:Metal panels up to roof
Skylight
Lower Level:NA
Upper Level:Energy-efficient lighting and skylights
Clear Height
Lower Level: 9.2 m
Upper Level: 9.2 m at eaves
Fire Fighting
Ceiling sprinklers, K II 5 external and internal hydrants
Lighting
LED fixtures to provide 150 lx illumination
Roof
Docking Type
Office
Parking
Structure
Truck Apron
Ventilation
Dock Doors
Fire Detection
Floor
Wall
Skylight
Clear Height
Fire Fighting
Lighting
Gallery
- Master Plan
- 3D Views