IndoSpace Chakan 1 Phase II
  • IndoSpace Industrial & Logistics Park

    Chakan I Phase II, Maharashtra, Pune

  • Total Land Parcel

    38 Acres

  • Total Chargable Area

    9,63,380 sq. ft

  • Type of Land

    RED (Hazardous)

  • Usage

    Industrial / Logistics Park

IndoSpace Chakan 1 Phase II
  • IndoSpace Industrial & Logistics Park

    Chakan I Phase II, Maharashtra, Pune

  • Total Land Parcel

    38 Acres

  • Total Chargable Area

    9,63,380 sq. ft

  • Type of Land

    RED (Hazardous)

  • Usage

    Industrial / Logistics Park

The Chakan industrial area phase 2 in Pune has developed into a strong automobile hub over the last decade. Various auto giants like Mercedes Benz, Mahindra and Mahindra and Volkswagen have set up their manufacturing plants in this industrial area, besides companies to make automobile components like ARaymod, Ina bearing. With a number of proposed investments of global phone manufacturers in and around Chakan, Pune has been gaining the attention of electronics manufacturers too. Just 35 km away from Pune, Chakan Phase 2 is also a well-established industrial area under the Maharashtra Industrial Development Corridor (MIDC). It has also seen a massive footfall of global companies over the past decade.

Our Grade-A warehousing and logistics Park, IndoSpace Industrial & Logistics Park Chakan I Phase 2, is a testament to our extensive footprint in this region. Spread over 38 acres, this industrial park in Chakan is just 20 km from the Mumbai-Pune Expressway. It is surrounded by MIDC developments and enjoys great proximity to neighbouring industrial areas like Ranjangaon, Talegaon. It also offers easy connectivity with Pune-Nashik Highway NH 60 at a distance of 10 km and Pune-Ahmednagar-Aurangabad Highway. With Pune International Airport at a distance of 35 km, Pune Railway Station just 40 km away and JNPT at a distance of 120 km, it is easily accessible via multi-modal transport.

Unique Features Of Indospace, Chakan I Phase II, Industrial & Logistics Park

Distance from Mumbai-Pune Expressway - 20 km.

Easy connectivity to Highways namely, Pune - Mumbai, Pune - Nashik, Pune - Ahmednagar - Aurangabad.

The warehousing and logistics park is surrounded by MIDC development.

3 Warehousing and logistics Parks already operational.

ACCESSIBILITY

SUPERIOR BUILDING STRUCTURE

*This image is for representational purpose only

Roof

Docking Type

Office

Parking

Structure

Truck Apron

Ventilation

Dock Doors

Fire Detection

Floor

Wall

Skylight

Clear Height

Fire Fighting

Lighting

Roof

Lower Level: RCC slab
Upper Level: ‘Standing seam’, premium roof system that provides 10 years leak-proof warranty and capable of taking solar panel load.

Docking Type

Internal

Office

Over 2 floors: Ground & Mezzanine

Parking

For two and four-wheelers at the office entrance

Structure

Lower Level: The lower level has RCC framed structure with large spans and mezzanine level office provision.
Upper Level: Pre-engineered building, optimised column spacing, and mezzanine level for office

Truck Apron

Concrete, 16.5 m (from the the face of dock wall to edge of pavement)

Ventilation

Lower Level: The lower level has passive ventilation through windows & louvred panels on the external wall, with provision to increase air changes through mechanical ventilation.
Upper Level: Passive ventilation to provide 3-6 air changes through louvred panels on external walls and roof monitor

Dock Doors

Manually operated rolling shutters and mechanically operated dock levellers

Fire Detection

Global NFPA/FM/NBC standard firefighting & suppression systems

Floor

5T/M2. Flat / Super flat floors, FM2-compliant design to support high cube racking

Wall

Lower Level: The upper level has metal panels up to the roof.
Upper Level: Metal panels up to roof

Skylight

Lower Level: NA
Upper Level: Energy-efficient lighting and skylights

Clear Height

Lower Level: 9.2 m
Upper Level: 9.2 m at eaves

Fire Fighting

Ceiling sprinklers, K II 5 external and internal hydrants

Lighting

LED fixtures to provide 150 lx illumination

Roof

Lower Level: RCC slab
Upper Level: ‘Standing seam’, premium roof system that provides 10 years leak-proof warranty and capable of taking solar panel load.

Docking Type

Internal

Office

Over 2 floors: Ground & Mezzanine

Parking

For two and four-wheelers at the office entrance

Structure

Lower Level: The lower level has RCC framed structure with large spans and mezzanine level office provision.
Upper Level: Pre-engineered building, optimised column spacing, and mezzanine level for office

Truck Apron

Concrete, 16.5 m (from the the face of dock wall to edge of pavement)

Ventilation

Lower Level: The lower level has passive ventilation through windows & louvred panels on the external wall, with provision to increase air changes through mechanical ventilation.
Upper Level: Passive ventilation to provide 3-6 air changes through louvred panels on external walls and roof monitor

Dock Doors

Manually operated rolling shutters and mechanically operated dock levellers

Fire Detection

Global NFPA/FM/NBC standard firefighting & suppression systems

Floor

5T/M2. Flat / Super flat floors, FM2-compliant design to support high cube racking

Wall

Lower Level:The upper level has metal panels up to the roof.
Upper Level:Metal panels up to roof

Skylight

Lower Level:NA
Upper Level:Energy-efficient lighting and skylights

Clear Height

Lower Level: 9.2 m
Upper Level: 9.2 m at eaves

Fire Fighting

Ceiling sprinklers, K II 5 external and internal hydrants

Lighting

LED fixtures to provide 150 lx illumination

Roof

Docking Type

Office

Parking

Structure

Truck Apron

Ventilation

Dock Doors

Fire Detection

Floor

Wall

Skylight

Clear Height

Fire Fighting

Lighting

Phone