-
IndoSpace Industrial & Logistics Park
Khopoli II, Maharashtra, Mumbai
-
Total Land Parcel
59 Acres
-
Total Chargeable Area
11,86,377 sq. ft
-
Type of Land
RED (Hazardous)
-
Usage
Industrial / Logistics park
-
IndoSpace Industrial & Logistics Park
Khopoli II, Maharashtra, Mumbai
-
Total Land Parcel
59 Acres
-
Total Chargeable Area
11,86,377 sq. ft
-
Type of Land
RED (Hazardous)
-
Usage
Industrial / Logistics park
Maharashtra is well-known for its strong ecosystem of industrial belts and areas. Khopoli near Khamboli is an established industrial city in the Raigad district of Maharashtra. Khamboli industrial area is home to several significant companies including Mahindra Ugine Steel, Uttam Galva Steel, Bhushan Steel, JSW Ispat Steel, Colour Labs, Wartsila India, and Alta Laboratories. Situated between Mumbai and Pune, it is near NH-4 (Mumbai–Pune–Bangalore Highway), about 80 km from Mumbai and is a prominent steel destination of India. Its strategic location enables easy access to the Mumbai-Pune Expressway, Central Railway, upcoming Navi Mumbai International Airport and JNPT Port at a distance of 64 km. Located on Pen-Khopoli Road (NH-166D), IndoSpace Industrial & Logistics Park Khopoli II is a Grade-A space about 8 km away from the Mumbai-Pune Expressway. It is also close to the NH-48, an important national highway that connects the site with the neighbouring states of Gujarat and Karnataka. It will also benefit from the major industrial developments along Khopoli–Pen Road, Khopoli – Patalganga Road and Khopoli–Pali Road declared by the Maharashtra Government. It is close to the major industrial areas of Khalapur, Taloja and Rasayani as well as just 38 km from Panvel town and 26 km from Pen town. These two towns have a large workforce, and the neighbouring industrial areas highly depend on them for services. The convenience in operations and a strategic location make Khopoli II an ideal destination for companies looking to grow in this region.
Unique Features Of Indospace, Khopoli II, Industrial & Logistics Park
ACCESSIBILITY
- Transport
- Location Advantage
- Airport
- Airport 2
- Seaport
- Railway Station
- Seaport 2
- National Highways
- State Highways
- City center
- Company Nearby 1
- Hospital
- Hotel 1
- Hotel 2
- Hotel 3
- Industrial Area 1
- Industrial Area 2
SUPERIOR BUILDING STRUCTURE
Roof
Office
Parking
Structure
Truck Apron
Ventilation
Dock Doors
Fire Detection
Floor
Wall
Skylight
Clear Height
Fire Fighting
Lighting
Docking Type
Roof
‘Standing seam’, premium roof system that provides 10 years leak-proof warranty, also capable of taking solar panel load.
Docking Type
Internal.
Office
2 floors: Ground & Mezzanine.
Parking
Available for two and four-wheelers at the office entrance.
Structure
Pre-engineered building, expertly optimised column spacing, and a mezzanine level for the office.
Truck Apron
Concrete, 16.5 m (from the face of the dock wall to edge of pavement).
Ventilation
Passive ventilation to provide 3-6 air changes through louvred panels on external walls and roof monitors.
Dock Doors
Manually operated rolling shutters and mechanically operated dock levelers.
Fire Detection
Global NFPA/FM/NBC standard firefighting & suppression systems.
Floor
5T/M2. Flat / Super flat floors, FM2-compliant design to support high cube racking.
Wall
Pre-cast concrete walls up to 3.6 m and metal panels up to the roof.
Skylight
Energy-efficient lighting and skylights.
Clear Height
9.2 m – 12 m
Fire Fighting
Ceiling sprinklers, K II 5 external and internal hydrants.
Lighting
LED fixtures to give 150 lx illumination.
Roof
‘Standinga seam’, premium roof system that provides 10 years leak-proof warranty, also capable of taking solar panel load.
Docking Type
Internal.
Office
2 floors: Ground & Mezzanine.
Parking
Available for two and four-wheelers at the office entrance.
Structure
Pre-engineered building, expertly optimised column spacing, and a mezzanine level for the office.
Truck Apron
Concrete, 16.5 m (from the face of the dock wall to edge of pavement).
Ventilation
Passive ventilation to provide 3-6 air changes through louvred panels on external walls and roof monitors.
Dock Doors
Manually operated rolling shutters and mechanically operated dock levelers.
Fire Detection
Global NFPA/FM/NBC standard firefighting & suppression systems.
Floor
5T/M2. Flat / Super flat floors, FM2-compliant design to support high cube racking.
Wall
Pre-cast concrete walls up to 3.6 m and metal panels up to the roof.
Skylight
Energy-efficient lighting and skylights.
Clear Height
9.2 m – 12 m
Fire Fighting
Ceiling sprinklers, K II 5 external and internal hydrants.
Lighting
LED fixtures to give 150 lx illumination.
Roof
Office
Parking
Structure
Truck Apron
Ventilation
Dock Doors
Fire Detection
Floor
Wall
Skylight
Clear Height
Fire Fighting
Lighting
Docking Type
Gallery
- Master Plan
- 3D Views