It took us 470 days to build a Germany to India association with our Force MTU partnership

IndoSpace Success FMTU
IndoSpace Success FMTU

Client: FORCE MTU

Force MTU Power Systems is a joint venture between Force Motors and Rolls-Royce Power Systems AG. The former is a homegrown Indian automotive brand, while the latter is a German company that designs and manufactures industrial engines and parts. Force MTU combines the expertise of both to produce top-of-the-line engines for multiple applications. Notably for the Series 1600 engines for power generation and rail underfloor applications.

Force MTU's Requirement

Force MTU wanted to relocate their manufacturing operations from Germany to India. They aimed for the Chakan MIDC area near Pune as it was and still is an in-demand hub for various industries. Force MTU needed the assistance of an experienced and reliable developer-partner to undertake and complete such a project on time and with high- quality standards. In short, they wanted a modern and advanced specification plug-and-play facility.

IndoSpace's Solution

Design Technical Execution ForceMTU
Location Icon

The IndoSpace Advantage

Force MTU conducted thorough research about the industrial real estate developers in and around the Chakan region. They sought information about those who had a proven track record of project delivery and technical capabilities. Post the assessment, IndoSpace was on board as Force MTU's preferred developer-partner. We acquired complete knowledge about Force MTU's requirements and suggested IndoSpace Industrial Park Chakan I Phase III as the new destination for their relocation to India.

Design Icon

Design, Technical, & Execution Expertise

Force MTU wanted their new manufacturing facility in Chakan to have a distinct process layout from its German plant. Following were the goals we jointly agreed upon for the intricate project:
- Product quality must adhere to the client’s international team of experts.
- IndoSpace must provide 24-hour service utility maintenance and stable operations.
- Availability of utilities and resources needed for the manufacturing unit must be secured, such as high-tension power connection, industrial water, sewer and storm line connection, internal bituminous road, vehicle parking, fire hydrant and sprinkler system, and security gate with CCTV.
- IndoSpace would allot a total chargeable area of 0.18 mn sq. ft to the project along with a construction timeline of 470 days.

- IndoSpace must achieve project delivery within the agreed timelines.

IndoSpace Advantage ForceMTU
IndoSpace Advantage ForceMTU
Design Icon

Design, Technical, & Execution Expertise

Force MTU wanted their new manufacturing facility in Chakan to have a distinct process layout from its German plant. Following were the goals we jointly agreed upon for the intricate project:
- Product quality must adhere to the client’s international team of experts.
- IIndoSpace must provide 24-hour service utility maintenance and stable operations.
- Availability of utilities and resources needed for the manufacturing unit must be secured, such as high-tension power connection, industrial water, sewer and storm line connection, internal bituminous road, vehicle parking, fire hydrant and sprinkler system, and security gate with CCTV.
- IndoSpace would allot a total chargeable area of 0.18 mn sq. ft to the project along with a construction timeline of 470 days.

- IndoSpace must achieve project delivery within the agreed timelines.

Customization Icon

Customisation & Sustainability


IndoSpace implemented several green initiatives for Force MTU to ensure efficient, sustainable, and environment-friendly operations were undertaken. It included the following features:

  • Pre-engineered building, optimised column spacing, and a mezzanine floor for increased utilisation of ground floor, including fit-outs
  • Precast concrete walls up to 3.6 m high and metal panels up to the roof
  • Manually operated rolling shutters and mechanically operated dock levellers
  • LED/T5 fixtures for providing 150 lux illumination
  • Clear height of 9.2 m
  • 2T/MT 2, flat/super flat floors, and FM2-compliant design to support high cube racking
  • Fire Hydrant System as per National Building Code (NBC) India, fire-fighting system (sprinkler system), gas-based fire suppression systems for server room, and fire detection system as per FM Global standards
  • 2500 kVA three-phase power connection from Maharashtra State Electricity Board (MSEB), with complete electrification
  • HVAC system for humidity control and dust-free ventilation, comfort HVAC system with 350 TR chiller installation, process HVAC system with 299 TR chiller, and one cooling tower with 1755kW capacity for hot test process
  • Concrete truck apron, 16.5 m long (from the face of dock wall to edge of pavement)
  • Rock wool insulation, energy-efficient lighting and skylights
  • Other infrastructure set-up and construction include:
    - 15 EOT (building) cranes of several capacities and a whole fuel management system with 20 kl diesel storage and 20 kl engine oil storage, along with its process distribution lines within the shop floor for diesel and engine oil
    - Complete compressed air connection line with the compressor and its distribution system
    - Complete passive infrastructure for IT/DATA/VOICE along with the process requirements
    - Complete BMS system for all utilities
    - Liner panel for the entire roof and wall with rock wool insulation for thermal and dust control
    - Paint booth pit
indospace Success story result ForceMTU
indospace Success story ForceMTU

End-Result

End-Result

IndoSpace completed a high-quality advanced-specification facility suiting client's global standards within 470 days. Force MTU could commence its operations within the stated time frame.